Arkansas Rural Water Association
  • Email
  • Facebook

Call (501) 676-2255

  • Home
  • Membership
    • ARWA Membership
    • Join or Renew
  • About
    • About ARWA
    • Districts & Directors
    • Staff
    • Membership Directory
    • Location
  • Training
    • Training Courses
      • Backflow Training
      • Microbiology Training
      • Wastewater Training
      • Water Training
    • Training Calendar
      • All Training
      • Backflow Training
      • Board Training
      • Microbiology Training
      • Plumbing Training
      • Wastewater Training
      • Water Training
      • 2026 Training Calendar (PDF)
    • ARWA Online Training Portal
    • Training Hours
    • Apprenticeship Program
    • Order Books
  • Events
    • Scholarship Golf Tournament
    • Bi-Annual ARWA Operator Expo
    • Annual Technical Conference
  • News
    • News Updates
    • Job Openings
    • Items For Sale
    • CCR Delivery Options
  • PROGRAMS
    • Financial Services
      • Interim Loan Program
      • Flexible Term Loan
    • Insurance Coverage
    • USDA Rural Development
  • Resources
    • ADVERTISE
    • Products & Services Portfolio
    • Scholarship Fund
    • Partners
    • Bill Tracking Report
    • ARWA Magazine
    • State & Federal Agencies
    • Write to your Congressman
    • USDA – Rural Development
    • Ford Fleet Program
    • Communication Tool for Utilities
    • Website + Alerting System
    • Jobs
  • Contact
Search the site...

Interim Loan Program

The purpose of the program is to provide construction funding for water and sewer systems that have received a permanent loan commitment from the United States Department of Agriculture-Rural Development (“RD”) (formally known as the Farmers Home Administration). The program structure provides communities access to short-term loan funds at favorable interest rates. Loan proceeds are utilized for the construction period only and are repaid with RD bond funds when the project is complete. RD will provide the permanent financing once the construction phase is complete and project conditions have been met.

Rural Water Financing Agency The program is designed as a tax-exempt pooled financing with flexible loan terms. The administrator of the program is the Arkansas Rural Water Association and the issuer Rural Water Financing Agency (the “Agency”).  The effective rate of borrowing under the program is based on a stated loan rate less an interest earnings credit on undisbursed construction proceeds.

History of the Program

Since the program’s inception in 1995, the Agency has made over $1.6 billion in loans to finance utility projects.

 

Loan Approval Process

  1. Completed application, Rural Development Letter of Conditions, and most recent audit are submitted to the Agency for preliminary approval.
  2. The Agency will issue a conditional approval letter to the Borrower pending completion of the loan package.
  3. The Borrower formally adopts and executes all legal documents associated with the loan package.
  4. The Agency funds its loan to the Borrower and construction disbursements may commence. All loan interest is capitalized within the loan amount.
  5. The Borrower requests funds from Regions Bank (Trustee). The RD, Engineer and Borrower must sign and approve each request for funds. No invoices are required. Construction funds are wired to the Borrower’s local construction depository for actual disbursement.
  6. Upon project completion, payoff is made to Regions Bank with RD bond funds. The payoff equals construction draws plus interest accrued during construction less interest earned.

Next Training/Events

Jun
4
Thu
all-day Treatment and Distribution Exam ... @ ARWA Training Center
Treatment and Distribution Exam ... @ ARWA Training Center
Jun 4 all-day
*NO TRAINING HOURS GIVEN*
Jun
5
Fri
all-day ADH Exams | June 5, 2026 @ ARWA Training Center
ADH Exams | June 5, 2026 @ ARWA Training Center
Jun 5 all-day
Visit the ADH Website for information If you are TESTING, please pre-register and prepay the testing fee with ADH @ 501-661-2623 or ADEQ @ 501-682-0998 45 Days before attending classes.
Jun
9
Tue
all-day Basic Water Math | June 9, 2026 @ Bono Community Center
Basic Water Math | June 9, 2026 @ Bono Community Center
Jun 9 all-day
Download Training Agenda
Jun
10
Wed
all-day Applied Water Math | June 10, 2026 @ Bono Community Center
Applied Water Math | June 10, 2026 @ Bono Community Center
Jun 10 all-day
Download Training Agenda
Jun
16
Tue
all-day Basic Water Distribution | June ... @ Phillips Community College
Basic Water Distribution | June ... @ Phillips Community College
Jun 16 – Jun 18 all-day
Download Training Agenda
View Calendar

Recent Posts

  • Job Opening: Water Treatment/Distribution Operator – Eureka Springs, AR
  • Job Opening: Manager, Plant Operations (Water & Wastewater) – Mountain Home, AR
  • Job Opening: Water Distribution Technician/Operator – Camden, AR
  • Job Opening: Water Treatment Technician/Operator – Camden, AR
  • Job Opening: Water Distribution Supervisor – Camden, AR

Quick Links

  • Join ARWA
  • Make a Payment
  • ADVERTISE
  • 2026 ARWA Training Calendar (PDF)
  • Membership Directory
  • ARWA Partners
  • ARWA Magazine
  • USDA – Rural Development
  • State & Federal Agencies
  • Write to your Congressman
  • Get a Website + Alerting System
  • Jobs
  • Items For Sale
  • Arkansas Municipal League

ARWA Headquarters

240 Dee Dee Lane
Lonoke, AR 72086-8156
Tel: (501) 676-2255
Fax: (501) 676-2266

Mailing Address
P.O. Box 860
Lonoke, AR 72086

Email: [email protected]
Follow Us on Facebook

NRWA
ARWA is a proud member of National Rural Water Association – America’s Largest Utility Membership
© Arkansas Rural Water Association. All rights reserved. | Website by RuralWaterImpact.com - Smart Websites for Smart Water Systems